Government Contracting Glossary
- Contractor
- A gambler who never gets to shuffle, cut or deal.
- Bid Opening
- A poker game in which the losing hand wins.
- Bid
- A wild guess carried out to two decimal places.
- Low Bidder
- A contractor who is wondering what he left out of his bid.
- Engineer's Estimate
- The cost of construction in heaven.
- Project Manager
- The conductor of an orchestra in which every musician is in a different union.
- Critical Path Method
- A management technique for losing your
shirt under perfect control.
- OSHA
- A protective coating made by half-baking a mixture of fine print,
red tape, split hairs and baloney; usually applied at random with a shotgun.
- Strike
- An effort to increase egg production by strangling the chicken.
- Delayed Payment
- A tourniquet applied at the pockets.
- Completion Date
- The point at which liquidated damages begin.
- Liquidated Damages
- A penalty for failing to achieve the impossible.
- Auditor
- Person who goes in after the war is lost to bayonet the wounded.
- Lawyer
- Person who goes in after the auditors to strip the bodies.